GENERAL RESOURCES
- 2021 – Western NY PC PLA
- 2021 – Central NY PC PLA
- 2020 – Memorandum of Understanding between DASNY and BCTC
- 2020 – Renovation and Rehabilitation PLA
- 2020 – New Construction PLA
- 2015 - Memorandum of Understanding between DASNY and the BCTC
- 2015 - Renovation and Rehabilitation PLA
- 2015 - New Construction PLA
- 2012 - Renovation PLA
- 2012 - New Construction PLA
DASNY Construction Site Safety Video (choose language and media type):
- English Quick Time (.mov) | English Windows Media Player (.wmv)
- Spanish Quick Time (.mov) | Spanish Windows Media Player (.wmv)
DESIGN RESOURCES
- DASNY BIM Standards Manual | PDF
- AIA Standard | CTB
- DASNY AutoCAD Export Layers | TXT
- DASNY AutoCAD Import Lineweights | TXT
- DASNY NavisWorks Options | XML
- DASNY Revit Architectural Template | RTE
- DASNY Revit Electrical Template | RTE
- DASNY Revit Mechanical Template | RTE
- DASNY Revit SM-PIM-FIM Template | RTE
- DASNY Revit Structural Template | RTE
- DASNY Roof Warranty | PDF
- Cover Sheet - B PDF | DWG
- Cover Sheet - C PDF | DWG
- Cover Sheet - D PDF | DWG
- Cover Sheet - E PDF | DWG
- Cover Sheet - E1 PDF | DWG
- Drawing Sheet - A (Stamp) PDF | DWG
- Drawing Sheet - B PDF | DWG
- Drawing Sheet - C PDF | DWG
- Drawing Sheet - D PDF | DWG
- Drawing Sheet - E PDF | DWG
- Drawing Sheet - E1 PDF | DWG
- Asbestos Removal (Upstate)
- Asbestos Removal (NYC)
- Asbestos Removal CMM (CMM projects only)
- Asbestos Removal (CUNY)
- Asbestos Removal (Minor projects only)
- Identification and Disposal of Hazardous Waste
- Lead Safe Work Practices OSHA
- Mold Remediation
- Non-Liquid PCB Material Removal
- Removal and Disposal of Universal Wastes
- Standard Firestopping Specification
- Standard Lead Abatement Specification
- Underground Storage Tank Removal Specification
- Excavation, Transport and Disposal of Contaminated Soils
Waste Guidance Documents
- Soil Disposal
- Waste Disposal Types - Satellite Diagram
- Generated Waste-Holding/Shipment Times & Storage/Shipment Training Requirements
Guidance Documents
- Applicable Asbestos Regulations & Specifications for NYC Projects
- Air Permitting Flow Chart, Boilers
- Design Kick-Off for Environmental Impacts
- Guidance for Contaminated or Impacted Soils
- Hazardous Materials Encountered During Construction Guidance
- Information on Vermiculite and Asbestos Removal
- NYS DEC Air Emission Permits for DASNY Projects
- NYS DOL Emergency Asbestos Project Notifications
- NYS DOL Emergency Variance Requests
- EPA non-ACM documentation Interpretation Letter
- NYC DEP Workplace Safety Plan & Asbestos Abatement Permit Checklists
- PCB Caulk Sampling & Analysis Guidance
CONSTRUCTION RESOURCES
- Construction General Conditions (June 17, 2021)
- Construction General Conditions (July 28, 2020)
- Construction General Conditions (May 1, 2018)
- Construction General Conditions (January 4, 2016)
- JOC General Conditions (September 21, 2022)
- JOC General Conditions (July 9, 2021)
- JOC General Conditions (September 17, 2020)
- JOC General Conditions (October 15, 2019)
- JOC General Conditions (May 1, 2018)
- Purchasing General Conditions (April, 2016)
- Purchasing General Conditions – Dock Delivery (June 15, 2021)
- DOL Wage Rate Schedule (PRC Number Lookup)
Click the button below to access the Primavera Contract Management Tool: