SUNY Cortland Smith & Casey Tower Renovations CM at Risk

Solicitation #:2520
Issue Date:08/02/2018
Proposal Due:09/13/2018 - 5:00 PM
Classification:Professional Services Construction
Type:Request for Proposal (RFP)
Status:Archived
Subcontracting Provisioning Goals (%)
Minority Owned:15
Women Owned:15
Service Disabled Veteran Owned:6
Contract Terms
36 months
Location Where Goods to be Delivered or Service Performed
Cortland, NY

The Dormitory Authority State of New York (DASNY) is seeking proposals from Construction Manager’s-at-Risk to provide Professional Construction Management-at-Risk (CM @ Risk) services.  The CM @ Risk services will include pre-construction phase services and construction phase services in connection with the renovations to Smith and Casey Towers at the State University of New York at Cortland, 23 Water Street and 20 Broadway Avenue, Cortland, NY. At a minimum, the project will be designed and constructed to achieve LEED Silver Certification.  The scope of this project will be to renovate all 10 stories of each tower and demolish the existing two-story connector building, and construct a new nine-story connector building that spans between Smith and Casey Towers. The project, at a minimum, is required to achieve LEED Silver Certification. The tower exterior renovation scope includes, but is not limited to, reconditioning of the exterior shell, hazardous material remediation, and exterior window replacement. Interior tower renovation work includes, but is not limited to, hazardous material remediation, new bathroom finishes, rebuilding all showers, flooring replacements, door replacements, door hardware replacements, the addition of overhead lights in the bedrooms, and the addition of raceway outlets in the bedrooms.  Sprinklers will be added to the towers on floors three through ten, fire alarm equipment will be upgraded throughout, various mechanical, electrical, and plumbing system work also will be included.  The project will be constructed in phases.  Anticipated construction phasing is as follows and is contingent on the development of design documents:

Phase I (May 2019-June 2020)

Phase II (May 2020-June 2022)

Interested firms must possess substantial experience in: (1) providing Construction Manager-at-Risk services with projects of similar size, scope and complexity; in particular, residence hall construction and renovation (2) employing experienced staff with thorough knowledge of their area(s) of expertise; (3) managing complex phased projects and delivering projects within a tight construction schedule; and (4) working knowledge of the United States Green Building Council (USGBC) LEED rating system, specifically for projects which have received LEED certification.

 

Primary Contact

Stacie Bennett

RFP coordinator

Dormitory Authority of the State of New York

Procurement

515 Broadway

Albany, NY 12207-2964

United States

Phone: 518-257-3309

Email: rfpadministrator@dasny.org

Submit To Contact

Stacie Bennett

RFP coordinator

Dormitory Authority of the State of New York

Procurement

515 Broadway

Albany, NY 12207-2964

United States

Phone: 518-257-3309

Email: rfpadministrator@dasny.org

Documents

Firms submitting Expressions of Interests (EOI). Top firms deemed qualified by review of their respective EOI’s are Shortlisted and issued a Request for Proposal (RFP).