CSI Building 1C -Student Center Dining Hall and Kitchen Reconstruction renovation of the existing kitchen/servery, which is now beyond its useful life. Most of the work involves the renovation of Building 1C interior spaces at the First Floor Kitchen and Servery, Kitchen Support areas on the Cellar Floor, Park Café dining room, and an outdoor terrace with canopy
The scope includes:
Renovation of approximately 19,000 Square Feet of kitchen, servery, café, cafe terrace, a portion of the cellar, and outdoor kitchen equipment.
Abatement work includes but is not limited to the following: contaminated soil at the exterior work, and soil below the kitchen/servery slab openings.
Demolition work includes but is not limited to the following: the existing kitchen/servery, portions of the cellar kitchen support areas, park café, portions of the outdoor terrace, and some masonry openings for structure and MEP.
Construction includes, but is not limited to the following: Carpentry, Mechanical, Electrical, Plumbing, Sprinkler, and Telecom/Security activities.
Installation of all new kitchen equipment in the kitchen, servery, and cellar support areas.
Installation of steel and glass canopy, new concrete work, new sitework, minor roof work, signage, visual displays, and window treatment.
The estimated construction cost range is between$13,000,000 and $13,500,000.
Project Labor Agreement
The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO.
Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.
Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.
Please find links to the specifications and drawings below:
General Conditions for Construction dated June 17, 2021, will apply to the Contract Documents.
The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:
Percent of Total Work Force (EEO):
Minority & Women Workforce Goal (for all trades) 45%
Percent of Total Contract (M/WBE):
Minority Business Enterprise Goal 18%
Women's Business Enterprise Goal 12%
Service-Disabled Veteran Owned Businesses 6%
Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.
Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected].
Instructions for Submission of the EOI Packages:
Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.
Each package shall be submitted with:
- A Cover Page that clearly identifies:
- The Legal Name of the Company submitting the EOI
- The Project Name for which the EOI is being submitted
- The Date of Submission
- Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number.
- The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation.
- All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation.
Tabs must be in the following sequence:
Tab 1 – Company Profile
Provide a company profile that includes the following information:
- Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project.
- Date Established – When the company was founded.
- Company Address – Primary business location.
- Ownership Information – Name and resumes of all principal owners.
- Client List – Summary of public and private sector clients.
- Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers.
- Equipment - Overview of all equipment owned by the company.
- Self-Performed Services - Description of all services the company performs directly (not subcontracted).
- MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable).
Tab 2 –Experience
Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.
Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years.
For each project, include the following information:
- Name of the project designer
- Firm name and contact information
- Project title and location/facility
- Brief description of the project
- Total construction cost
- Construction start date
- Substantial completion date
- Indicate role as prime contractor or subcontractor
- Percentage of the work that was self-performed
If applicable, also include a list of all DASNY projects completed within the last 5 years.
Tab 3 – Project Schedules
Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.
Tab 4 – Safety Program
Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.
Tab 5 – Résumés
Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.
Tab 6 – Potential Subcontractors
Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.
Tab 7 – Anticipated Workload
Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.
Tab 8 – Experience Modification Rating
Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.
Tab 9 – Bonding Capacity
Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.
Tab 10 – NYS Vendor Responsibility Questionnaire
Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.
Eligibility/Qualifications Requirements/Preferences:
Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.
Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.
In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.
Primary Contact
Kevin Leavy
Sr. Field Representative
Downstate Construction
2800 Victory Boulevard
Building 3A - Room 3A-104
Staten Island, New York 10314
United States
Phone: 718-982-2233
Email: [email protected]
Submit To Contact
Joshua Powers
Sr. Procurement Administrator
DASNY
Procurement
515 Broadway
Albany, NY 12207
United States
Phone: 5182573341
Email: [email protected]
| Company Name | Contact Name | Phone | Website | Fax | Designation | Goods/Services | |
|---|---|---|---|---|---|---|---|
| Amcon Contracting Inc | Ashraf Ahmed | 7188941531 | [email protected] | 7188941534 |
|
N/A | |
| Bedrock General Construction LLC | Beshoy Endrawes | 2017215894 | [email protected] | https://bgcst.com/ |
|
General Construction: Building, Mechanical, Electric, and Plumbing. | |
| Designs by D and J LLC | Dominique Gabriel | 3476886897 | [email protected] | www.Designsbydandjinfo.com |
|
||
| EBONY WOOD CRAFT CORP | Alexis Villalona | 3472944070 | [email protected] | ebonywc.com |
|
||
| LAW Lighting Inc | Lisa Wasicsko | 9147403065 | [email protected] | lawlighting.com | 19147403612 |
|
Supplied lighting and lighting controls |
| Mazzone Paint Center | Stephanie Kutch | 3477991140 | [email protected] |
|
|||
| Peak Security Plus Inc | Mr. Emmanuel Osula | 7185966346 | [email protected] | peaksecurityplus.com | 7187227550 |
|
security guard services, fire guard services, fire safety services and flagman/crossing guard services |
| TEXAS SECURITY CORPORATION | Andrew Ugbomah | 9176903538 | [email protected] | www.texassecuritycorporation.com |
|
PRIVATE INVESTIGATION SERVICES UNARMED SECURITY SERVICES ARMED SECURITY GUARD SERVICES FIRE SAFETY AND FIRE SAFETY DIRECTOR |
|
| Titan Engineers PC | Arum Mayangarum | 9086240044 | [email protected] | titanengineers.com |
|